frame_edge_scope
Back to L2 | Browse all axes | Browse all options
Axis
frame_edge_scopeon sub-layerl2_e(layerl2).
Sub-layer
l2_e
Axis metadata
Default:
'derived'Sweepable: True
Status: operational
Operational status summary
Operational: 4 option(s)
Future: 0 option(s)
Options
target_and_predictors – operational
Apply the rule to target and all predictors.
Default scope: every series in the panel passes through the stage. Maintains consistency between target and predictors (e.g. both differenced, both winsorised).
When to use
Default; matches McCracken-Ng’s convention.
References
macroforecast design Part 2, L2: ‘preprocessing is the only layer with a strict A→B→C→D→E execution order; every cell follows the same pipeline.’
Related options: predictors_only, target_only, not_applicable
Last reviewed 2026-05-04 by macroforecast author.
predictors_only – operational
Apply only to predictors; leave the target untouched.
Used when the target’s transform / cleaning policy is controlled separately (e.g. user already applied a tcode to the target via raw_panel).
When to use
When the target enters the pipeline already cleaned.
References
macroforecast design Part 2, L2: ‘preprocessing is the only layer with a strict A→B→C→D→E execution order; every cell follows the same pipeline.’
Related options: target_and_predictors, target_only, not_applicable
Last reviewed 2026-05-04 by macroforecast author.
target_only – operational
Apply only to the target.
Rare scope; used when predictors are pre-engineered and do not need this stage (e.g. PCA scores are already stationary).
When to use
Pre-engineered predictor panels.
References
macroforecast design Part 2, L2: ‘preprocessing is the only layer with a strict A→B→C→D→E execution order; every cell follows the same pipeline.’
Related options: target_and_predictors, predictors_only, not_applicable
Last reviewed 2026-05-04 by macroforecast author.
not_applicable – operational
Skip the stage entirely (gate inactive).
Used when an upstream stage already produced the desired form. Equivalent in effect to selecting the no-op option on the primary axis.
When to use
Pipelines that bypass this stage by construction.
References
macroforecast design Part 2, L2: ‘preprocessing is the only layer with a strict A→B→C→D→E execution order; every cell follows the same pipeline.’
Related options: target_and_predictors, predictors_only, target_only
Last reviewed 2026-05-04 by macroforecast author.